Inquiry
Inquiry
Time of issue:2020-03-17 00:00:00
What's App:+86 15360439294
WeChat:15360439294
Skype:8615360439294
Successful Trial Of Oasis New Water Dispensor Injection Tools


Gas Auxiliary Injection Molding Parts


Meike’s Summer Business Travel to Our Partners in USA
Business Trip, USA partners


General Electric Appliances (GEA) MRO Project Completes First Production Delivery


6000㎡Added in Our New Factory for Building More Specilized Injection Mould Workshop
With the gradually growing business demands , Meike has decided to add another 6000 ㎡ in our new factory for building more specilized injection mould workshop .


Light Box and Related Color Difference Identification Equipment Added to Enhance the Quality Control of Injection Molding Parts
In order to meet the requirements of color difference control of injection parts, Meike added the light box and colorimeter of X-rite SpectraLight QC.


First Samples of GE-Promixer Project
In July this year, we received orders for ge-Promixer projects totaling more than a dozen sets of molds and injection molding business .This week, the first trial of molds for 3 products has been completed and the first piece has been provided to customers, and in other projects we will also start trials and provide first samples within this month.


Welcome new customer from Mexico


Hisense Sound Bar
Our company undertake and completed mold fabrication for a Soundbar which is a set of plastic shell of high-end audio


Gas Assistance Injection Molding Technology
Gas-assisted molding show and related tips sharing.


2022 Spring Festival holiday arrangements
Firstly, thanks for the support and cooperation of all customers and suppliers, MEIKE has spent a pleasant year with you again, thank you!


The MEIKE Mould Basketball Team participated in the first Hong Kong Star Cup Basketball Tournament in 2022
Invited by Chongqing Hongyuncheng Sports Culture Communication Co., Ltd., the basketball team of MEIKE participated in “the Hong Kong Star Cup Series” hosted by Liangjiang Basketball Center and Chongqing Yuzhi Basket Sports Culture Communication Co., Ltd..


Address to the most valued Customers at the beginning of 2022.
Address to the most valued Customers at the beginning of 2022.
market and bussiness lookback,
Human resources
Improvement
Outlook


Factory move to new site with more powerful manufacturing facilities


A batch of molds from the US OASIS company was delivered yesterday
From the introduction of GE customers in the US,Our Company added an additional American client this year, The company is headquartered in the United States, With divisions on several continents of the world, The main products are household appliances;
The first order is the water dispenser cover, Representative is the drinking fountain front cover, English name: Front Penal, It Is a highlight grain surface product, The product itself is not complex structured, But the product has a large size oblique plane, we want to design of the mold for this oblique plane, The front and rear cavity of the mold will have a tunnel extraction core, and Long size Boss and Hook on the inclined top surface, So, the The mold must have a stripper structure, Ensure that the Boss and Hook can form smoothly, Secondly, this product have a Large mirror surface, In order to make the product without deformation, no flow marks and other molding defects, We used the inverted structure; As a result, the The mold became complicated, The mold size and height are larger than expected.
50 days, The T0 sample was successful, The mold has perfect for every movement, The defects on the surface are also controlled at the minimum;
The trouble is that the customer suddenly requires black products, the first time requires just have white product, After changing to black, The appearance defects of the product are enlarged, we in order to meet the requirements of customer, we has made some more changes to the products, Adjust the position of the stress and strength, Finally meet the customer’s requirements;
This batch of molds was delivered on Sunday, June 6,2021, The entire project lasted for 120 days.


Previous page
1
2
…
4
Next page
© 2020 CHONGQING MEIKE MOLD ENGINEERING CO.,LTD 渝ICP备16009365号 POWERED BY:300.cn
© 2020 CHONGQING MEIKE MOLD ENGINEERING CO.,LTD
渝ICP备16009365号 POWERED BY:300.cn